Wool Works
The Wool Works job consisted of the construction of a new customer owned substation. This was the first major decarbonization project in South Canterbury.
- This work was undertaken by our Technical team
- We assisted the customer to upgrade their boiler from thermal fuelled to electric powered
- Install RPS switchgear and 11kV cabling to new electric boiler