Alpine Energy

Acessibility Quick Links

Site Search form

Washdyke Switching Station

The Washdyke Switching Station job consisted of the upgrade of network capacity to facilitate the additional load of the Woolworks electric boiler upgrade.

  • Work was completed by the Technical and Underground teams
  • Install new 11kV RMU switchgear
  • Work with Civil Contractors