Washdyke Switching Station
The Washdyke Switching Station job consisted of the upgrade of network capacity to facilitate the additional load of the Woolworks electric boiler upgrade.
- Work was completed by the Technical and Underground teams
- Install new 11kV RMU switchgear
- Work with Civil Contractors