Alpine Energy

Acessibility Quick Links

Site Search form

Tekapo Comms Mast

The installation of a new 18 metre steel mast was undertaken for our Tekapo Sub Station.

The mast was to improve communications in the Mackenzie Basin. Our highly skilled technical team worked to ensure that this job was done on time and with as little disruption as possible.